2019

Utilities

Air Force Corporate Standards

Conduct a life cycle cost analysis and thoroughly evaluate feasibility of ground-source, solar photovoltaic, solar thermal, and grey-water reclamation systems. Include third party financing such as Energy Savings Performance Contracts (ESPCs), Enhanced Use Leases (EULs) and Public-Private Partnerships in the analysis to the maximum extent practical. Integrate all utilities and components to be visually cohesive with the facility with service lines below grade for Facility Group 1 and when economically feasible for Facility Groups 2, 3 and 4.

Fully integrate all utility equipment, components and subcomponents with facilities following Installation Facilities Standards (IFS) to eliminate the need for visual screening and to preserve architectural features. Wall-mounted utility elements on facades are prohibited for Facility Group 1 and discouraged for Facility Groups 2, 3 and 4.


Sustainability

Comply with guidance for energy efficiency and sustainable design under UFC 1-200-02. Aggressively pursue renewable-energy power sources such as ground-source and solar photovoltaic when cost effective.

UFC 1-200-02 High Performance and Sustainable Building Requirements
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-02

UFC 3-101-01 Architecture
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-101-01

UFC 3-201-01 Civil Engineering
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-201-01

UFC 3-401-01 Mechanical Engineering
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-401-01

UFC 3-440-01 Facility-Scale Renewable Energy Systems
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-440-01

UFC 3-501-01 Electrical Engineering
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-501-01

UFC 3-550-01 Exterior Electrical Power Distribution
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-550-01

UFC 3-575-01 Lightning and Static Electricity Protection Systems
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-575-01

UFC 3-580-01 Telecommunications Interior Infrastructure Planning and Design
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-580-01

UFC 3-600-01 Fire Protection Engineering for Facilities
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-600-01