2019

Building Configurations

Air Force Corporate Standards

Provide open-plan configurations for office, administrative, operational and related activities and spaces for maximum flexibility. Use a “core and shell” approach in which all building systems, infrastructure and permanent interior partitions anticipate two or more uses (operations) during a facility’s lifespan. Create flexible interior configurations using Furniture, Fixtures & Equipment (FF&E) and limit private offices and private rooms. Refer to AFMAN 32-1084 for space requirements. To the greatest extent, limit permanent partitions to core areas such as toilet rooms, stairs, mechanical and utility rooms. Use more durable long-lasting finishes in core areas for walls, ceilings, floor coverings and built-in casework. Coordinate interior FF&E layouts with structural grids.

Sustainability

Provide high-performance building configurations following UFC 1-200-02. Ensure passive design strategies are cost effectively incorporated before active mechanical systems are designed.

Fully integrate interior design to preserve and support passive systems and energy efficiencies. All passive systems such as thermal-mass walls, clerestories and daylighting systems, natural ventilation and convection cooling features, etc., must be sustained in interior design and renovations.

UFC 1-200-01 General Building Requirements
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-01

UFC 1-200-02 High Performance and Sustainable Building Requirements
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-02

UFC 3-120-10 Interior Design
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10

UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-410-01

UFC 3-450-01 Noise and Vibration Control
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-450-01

UFC 4-010-05 Sensitive Compartmented Information Facilities Planning, Design, and Construction
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-4-010-05

AFI 32-6002 U.S. Air Force Family Housing Planning, Programming, Design, and Construction
https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-6002/afi32-6002.pdf

USAF/DOE Design Guide for Military Family Housing - Energy Efficient Revitalization and New Construction
http://www.wbdg.org/FFC/AF/AFDG/milfam.pdf

US Air Force Family Housing Design Guide for Planning, Programming, Design and Construction
http://www.wbdg.org/FFC/AF/AFDG/familyhousing.pdf

Air Force Manual 32-1084 Facility Requirements
http://www.wbdg.org/FFC/AF/AFMAN/afman32-1084.pdf